Roy Rogers Road Area
Construction Schedule

PROJECTSTATUSLOCATIONTIMEFRAMEABOUTIMPACTDETOURJURISDICTION
Bull Mountain Sewer Pipe Improvements
ConstructionBeef Bend Rd from Myrtle Ave to 131st then south on SW 131st to Bedford
8/6/2018 to 4/1/2019
Upsizing an existing sanitary sewer.Beef Bend Road closed between SW Peachtree and SW 131st starting 9/4/2018 for 30 days, Expect delays.
To be determined
Clean Water Services
River Terrace South Pump Station and Pressurized Sewer Pipe Installation
Pending1/4 mile south of Beef Bend Rd to Myrtle AveOctober 2018 to September 2019
Construction of a new pump station and pressurized sewer pipeLane shifts on Roy Rogers Rd and lane closures on Beef Bend RdTo be determined
Clean Water Services
Roy Rogers Road Gravity Sewer Pipe installation
Pending.25 mile south of Roy Rogers and Beef Bend roads to .5 mile north
October 2018 to September 2019
Construction of a new gravity sewer pipe.Lane shifts on Roy Rogers Rd.
To be determined
Clean Water Services
River Terrace North Pressurized Sewer Pipe Installation PendingSW Satsuma Avenue to SW Calabash TerraceOctober 2018 to September 2019
Installation of new sewer line.One-way street access for six weeks. N/AClean Water Services
Bull Mountain Rd Widening and Traffic Signal Construction
ConstructionRoy Rogers Rd to 164th Ave4/18/2018 to 8/20/2018Widen to 3 lanes with bike lanes, sidewalks, and a roundabout. Install a traffic signal at Bull Mountain and Roy Rogers roads.Road closed for 2 months (6/18/18 to 8/20/18), Intermittent flagged construction at other times.If needed: 150th Ave and Beef Bend RdTigard
175th Avenue/Kemmer Road IntersectionConstructionIntersection of 175th Ave and Kemmer RdApril 2018-June 2019Construction of a single-lane roundabout, bicycle and pedestrian facilities, street lights, storm drain and utility upgradesIntermittent daytime lane closures, 9 a.m.-3:30 p.m. weekdaysTo be determinedWashington County Land Use & Transportation
175th Ave Widening
ConstructionScholls Ferry Rd and south of Alvord Lane10/1/2017 to 10/31/2021
Widening to 5 lanes, add bike and pedestrian facilities.Lane closures
N/AWashington County Land Use & Transportation
Beef Bend Culvert
PendingBeef Bend Rd to Oakmont Apartments
5/1/2019 to 10/31/2019Full closureTo be determined
Washington County Land Use & Transportation
Bull Mountain Rd SidewalkPendingNemarnik Dr to Grandview Ln
3/1/2019 to 7/1/2019
Sidewalk on east side south of Roshak; north side east of Roshak.Intermittent late closures 9 a.m.-3:30 p.m. weekdays.None, road will remain open.Washington County Land Use & Transportation
Murray Boulevard Overlay
PendingScholls Ferry Rd to Allen Boulevard
9/10/2018 to 9/13/2018; striping 9/18/2018-9/20/2018
Overlay (repavement) of Murray Rd between Scholls Ferry and Allen BoulevardLane closures.
N/A
Washington County Land Use & Transportation
Roy Rogers Rd Widening
PendingScholls Ferry Rd to 2,500 feet south of Bull Mountain Rd
10/1/2018 to 10/31/2021
Widening between Scholls Ferry Rd and 2,500 feet south of Bull Mountain Rd. Includes Willamette Water Supply Program pipeline and Clean Water Services Pressurized Sewer Pipe installation.Lane closures.
N/A
Washington County Land Use & Transportation
Scholls Ferry Road Overlay
PendingMurray Blvd to Teal Blvd
9/4/2018 to 9/6/2018; striping is expected on 9/16/2018Overlay (repavement) between Murray and Teal boulevards.Lane closures.
N/A
Washington County Land Use & Transportation
Scholls Area Water Supply Pipeline
PendingScholls Ferry Rd at Roy Rogers Rd to Tile Flat Rd at Grabhorn Rd2019 to 2020Drinking water pipeline installation.Flaggers, traffic delays, traffic barriers to separate traffic from trench work, shifted traffic lanes .N/A
Willamette Water Supply Program